Environmental Agency planes heat pump system for heating and cooling of their building at Vojkova street in Ljubljana. With the use of the project results and hydrological modeling influence on groundwater dynamics in the aquifer of Ljubljana polje and risk assessment for pollution of groundwater was made. These results are the basis for planning and winning permission for construction of planned energy efficient heating and cooling system for the building.
F.30 Professional assessment of the situation
COBISS.SI-ID: 1557589Results of the project showed that granted water rights for water abstraction exceeds recharge from precipitation of the Ljubljana polje aquifer. In case of unfavorable hydrological conditions maximum abstraction, according to the granted water rights, could lead to disturbance of natural balance. To avoid this danger and keep the possibility of water abstraction in more favorable hydrological conditions, critical head levels were determined. These levels indicate boundary conditions for sustainable use of the aquifer.
F.30 Professional assessment of the situation
COBISS.SI-ID: 1559893Plan of the (business and housing) building Gemini includes environmentally friendly heating and cooling (heat pump) system that exploits energetic potential of groundwater. With the use of the project results and hydrological modeling influence on groundwater dynamics in the aquifer of Ljubljana polje and risk assessment for pollution of groundwater was made. These results are the basis for planning and winning permission for construction of energy efficient system for heating and cooling of the planed building.
F.30 Professional assessment of the situation
COBISS.SI-ID: 1573461For the purposes of risk analysis local hydrological model was constructed. It comprises alluvial sediments on the left bank of river Sava on a part of protection zone of Jarški prod waterworks. The model uses boundary conditions of regional hydrological model and includes updated hydrogeological data. Results of the modeling are the basis for the planning of energy efficient system for heating of the panned building and condition for permission for construction of the wells.
F.30 Professional assessment of the situation
COBISS.SI-ID: 1506645Risk analysis was made for the purposes of construction of research - abstraction well SQL-1/08 which is planned for exploitation of groundwater energetic potential for air conditioning of a new sport facility in Štepanja vas in Ljubljana polje area. Established acceptable risk is the basis for permission for construction of the planned well.
F.30 Professional assessment of the situation
COBISS.SI-ID: 1555797